Construction of a cast in place 3,000 GPM pumping station at a depth of 25 feet plus the upfits of three existing stations. The work space was limited in size by a creek and numerous embedded large boulders so that extensive sheet piling was necessary to make a safe environment.
Gilbert crews finishing the fine grade for a concrete foundation slab to be poured in place.