Three contracts at Grant Creek WWTP and Town Creek WWTP involving 1)installation of a 12 MGD Ultraviolet Disinfection System, 2)installation of a sludge thickening belt filter press and related sludge pumping system and storage building, and 3)construction of a 35’ deep 17.3 MGD wastewater pump station built in solid rock between a creek and three other water bearing structures.
Gilbert crews have completed poured in place concrete structures from left to right; Parshall Flume, UV Contact Structure, and Cascade Aeration. Today these structures are below grade.
Finished UV Disinfection System Grand Opening.
Gilbert crews erecting pre-assembled prepainted rafter beam gang for sludge storage facility.